Projects > No. 5 Substation > Overview

ENMAX Power Corporation

OVERVIEW

ENMAX Power is proposing to modify the existing No. 5 Substation which will include:

  • Replacement of eight circuit breakers:
    • Six high voltage breakers outside of the existing substation building but within the existing substation fence line
    • Two medium voltage breakers inside the existing substation building


ENMAX Power No. 5 Substation Map

Substation 32

View/Download map pdf


CONSTRUCTION METHODS

The proposed construction activities will take place at the existing No. 5 Substation within the substation fence line. Temporary access accommodations and road closures may be periodically required during construction. ENMAX Power will work with stakeholders and The City of Calgary to minimize the impact to residences, businesses, and commuters in the area. There are no power outages impacting customers planned as part of the Project.

Contact Us

If you have any questions or wish to discuss this project, please contact us:

ENMAX POWER CORPORATION stakeholderrelations@enmax.com
403-514-1471

 REQUEST A CALL BACK

ALBERTA UTILITIES COMMISION (AUC)

403-310-4282
info@auc.ab.ca
www.auc.ab.ca

Quick Fact

For more than 100 years, ENMAX and its predecessors have delivered safe and reliable electricity in Calgary.

Customers are free to purchase natural gas services or electricity services from a retailer of their choice. For a list of retailers, visit ucahelps.alberta.ca or call 310-4822 (toll free in Alberta).