ENMAX POWER

Temporary outage for maintenance

Get the power temporarily disconnected, moved or reconnected, so you can complete your work safely and efficiently.

Before you get started, please read our information on Electrical Utility Meter Handling and Secondary Service Supply Restrictions.

Before you start

Electrical Utility Meter Handling and Secondary Service Supply Restrictions

Temporary Disconnect-Reconnect

This request is for a temporary disconnect-reconnect of existing secondary services or equipment via overhead/underground wires or the meter.


20220427-OakridgeCableReplace-002

Step 1: Request and view available times through the button below 

Step 2: Temporary Disconnect of Power (at the time of disconnect) 

Loading component...

Loading component...

Transformer (TX) Opening

This request is to open an ENMAX transformer or pedestal so that wires can be added or removed.


20220518-AspenSwitching-010

Loading component...

Loading component...

Overhead to Underground

This request is to replace existing overhead service feed with a new underground feed from the service pole.


20221005-SovereignCresNewService-046