Generator interconnection application
This form will take about 6 minutes to complete.
Read all the instructions before starting the form.
This form is:
-
Emergency / Backup - Open transition and closed transition (100ms or less)
-
Parallel / Non-export - In parallel with utility but do not exporting
-
Export generation - In parallel with utility and exporting
This form is NOT:
-
For automatic approval – further review and clarifications might be required before proceeding with the submitted request.
-
For service or maintenance request – any repair or service work for generator maintenance is not supported via this form.
Required documents to complete this form
-
Single line diagram (showing locable isolation design)
-
Generator specifications
-
Electrical site plan
-
Electrical equipment specification documents ("Export generator" only, e.g.: generator, transformer, solar panel, inverters, optimizers, energy storage)
-
Lockable isolation design