Moving an existing overhead secondary service from one location to another. Can include a relocation on the customer property or at the Enmax overhead supply point.
Temporary disconnection to facilitate maintenance/replacement of customer owned equipment.
Temporary disconnection to facilitate maintenance/replacement of customer owned equipment.
Temporary disconnection at the Enmax primary (high voltage) supply point.
2000 characters remaining
Will this disconnect affect other properties?*
*
Where would you like the disconnect to occur? (Select all that apply) *
2000 characters remaining
Have these properties been notified?
You must notify all affected properties before applying for this service.
Will this disconnect involve a primary metering tank and/or rental transformer(s)?
Please note: A return trip fee will be assessed if the customer or customer representative is not onsite at the scheduled time requiring an additional site visit to complete the requested work.
Your appointment start date should be at least 3 business days from submitting this request
Month DD, YYYY
‹
June 2026
›
Su
Mo
Tu
We
Th
Fr
Sa
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
The next available date is
Estimate time needed until reconnect
All requests for a temporary disconnection will be charged a mandatory 2-hour fee. If more than 2 hours are required, additional charges will be applied.
Estimate time needed until reconnect*
*
Unsaved changes
Are you sure you want to navigate away from this page? All changes will be lost.