Victoria Park Infrastructure Relocation

Project Overview

The City of Calgary has requested ENMAX Power to relocate underground electrical utilities associated with ENMAX Substation No. 5 located at 302 10 Avenue SE to accommodate the future Green Line LRT route.

Utility work in the Victoria Park area will occur in various stages beginning directly within Substation No. 5 and surrounding manholes. These manholes tie into Substation No. 5 from 9, 10 and 11 Avenue SE between 1 Street SE and 4 Street SE.

Project work includes the following:

  • Modifications within ENMAX Substation No. 5 to prepare for rerouting underground connections
  • Installing new manholes and underground connecting ducts
  • Installing cables in existing manholes and duct banks adjacent to ENMAX Substation No. 5 

Work inside the manholes will impact traffic east of Macleod Trail SE, along 10 Avenue SE and 3 Street SE. Both vehicle and pedestrian traffic accommodations are in place.

Please note, this work could produce various noise levels and minor vibrations during civil construction activities.

Access to all commercial buildings and rear fire egress in laneways will be maintained throughout construction. Businesses and residents directly impacted by construction activities will be notified in advance by ENMAX Power Customer Relations team.

For more information about the Green Line, please call 311 or visit Calgary.ca/greenline


Project Status

Work inside ENMAX No. 5 Substation began early September 2018 and will continue along 10 Avenue SE and 3 Street SE until project completion. The public will see an increase in ENMAX utility vehicles in the Victoria Park area for the duration of construction. ENMAX crews will be working in the utility right-of-way located along Macleod Trail SE, 10 Avenue SE & 3 Street SE.

Stage 2 construction will take place in the alleyway south of 10 Avenue SE. The alleyway will be restricted for the duration of construction. Access to both private & CPA parking lots will be from 10 Avenue SE and 11 Avenue SE.

Please check back regularly for continued project updates. The next phase of this project will be posted early Fall 2019.  


Questions?

Email: Power Customer Relations
Phone: 403-514-3990


The highlighted areas indicate the various project stages (1-4).  


The highlighted areas indicate Stage 2 construction and accessibility (phases 1-3). 


Project Schedule

Both civil and electrical work began early September 2018 with anticipated completion by mid-2020. 

STAGES CONSTRUCTION AREA CONSTRUCTION TIMELINE DETAILS
Stage 1 - COMPLETED

ENMAX No. 5 Substation

September 2018
Work will occur inside the substation.
 Stage 1
10 Avenue SE between Macleod Trail SE and 3 Street SE January 14 – June 2019
Traffic limited to eastbound only; temporary street parking; sidewalk closure on south side of 10 Avenue SE.
Stage 2 Alleyway south of 10 Avenue SE between Macleod Trail SE and 3 Street SE June 2019 – Fall 2019

Restricted access to alleyway south of 10 Avenue SE; temporary single lane & sidewalk closure east of Macleod Trail SE; access to parking lots via 10 Avenue SE & 11 Avenue SE.

Stage 3 to 4 - Still in Development
10 Avenue SE between 3 Street SE & Olympic Way SE; 3 Street SE between 10 Avenue SE and 11 Avenue SE Fall 2019 – mid-2020
Intermittent traffic lane, cycle track and sidewalk closures will be required.